Class 37 - RF Construction - 37414 - DCC Sound Fitted Coach Archive Every model includes PowerPack /
$233.00
Description
Every model includes PowerPack / Backup Power Capacitor Bank for up to ten seconds of power free running
Separately switched cab lighting and illuminated
it spent periods at Oswestry and Hereford before being withdrawn from Cardiff East Dock after a 16 year working life
the first of several hundred locomotives of a type that would revolutionise Railfreight across the UK (and Europe)
Class 37 - RF Construction - 37414 - DCC Sound Fitted Coach Archive Every model includes PowerPack /37414 Railfreight Construction The introduction of Class 156 Super Sprinters on the West Highland from January 1989 and on the Far North Kyle lines in the May triggered an exodus of Class 37 4s to freight work. By the end of that year, Laira, Motherwell and Tinsley had gained allocations, while Immingham and Thornaby both acquired three locos each in the middle of 1990, by which point half the sub class were south of the border. One of these was No.
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 189.80
US$ 19.99
US$ 14.99
US$ 17.99